MetroskopAll stations Česky

Nádraží Holešovice

Metro station · Holešovice · until 1990 Fučíkova

Nádraží Holešovice is a station of the Prague metro on line C. The track lies 7.0 m below the street and the station has been open since 3 November 1984.

Nádraží Holešovice station
Photo: Aktron, CC BY-SA 3.0, Wikimedia Commons
7.0 mbelow ground
53rddeepest of 61
1984opened

How deep is Nádraží Holešovice

The track at Nádraží Holešovice lies 7.0 m below the street. It is the 53rd deepest of 61 platforms.

Elevation: street 191 m a.s.l., track 184 m a.s.l. Depth is measured from the ground above the station to the track.

Step-free access

Step-free: lift or level access all the way to the platform

Step-free entrances from the street: 3 of 6. Source: PID open data.

Entrances from the street: 6

  • E1Level entrance
  • E2Level entrance
  • E3Level entrance
  • E4Level entrancestep-free
  • E5Level entrancestep-free
  • E6Level entrancestep-free

Official entrance names and step counts from PID.

Ridership

41 525people board or alight each day · 22nd busiest of 58
21 771 boardings19 754 alightings

One ordinary Wednesday, 11 November 2015, 5 am to midnight (PID and DPP survey). No newer per-station data has been published.

About Nádraží Holešovice

Nádraží Holešovice is a Prague Metro station on Line C, serving the Holešovice mainline railway station.

The station was known as Fučíkova after journalist Julius Fučík until 22 February 1990. The names Vrbenského and Partyzánská were also considered. The station was opened on 3 November 1984 as the northern terminus of Section III.C (the extension from Sokolovská, now named Florenc), a status it retained until 26 June 2004 when the line was extended to Ládví station, before it was extended to Letňany station in 2008.

The station is an underground station with two turning tracks and two concourses. It is located just 7 metres below ground, which posed significant challenges for the engineers working on the construction of Section IV.C1 between 2000 and 2004; ultimately, they had to bend the siding tracks downward so that the line could pass under the River Vltava at all. (The original plans from the 1980s had called for the Vltava to be crossed by a bridge.) The floods of August 2002 inundated the station, and the water subsequently seeped into the construction site for the extension and into the already completed and drained tunnels under the Vltava (which had been opened to the public shortly before during an open day).

Text: English Wikipedia, CC BY-SA 4.0.

Technical data

CLine C

Depth
7.0 m below ground
Track
184 m a.s.l.
Street above
191 m a.s.l.
Construction
Cut-and-cover
Opened
3 November 1984
Architect
Jiří Dušek, Jan Marek

Neighbouring stations

The whole station in 3D: escalators, passages, halls and entrances at their true depth beneath Prague.

Open in 3D