MetroskopAll stations Česky

Hloubětín

Metro station · Hloubětín

Hloubětín is a station of the Prague metro on line B. The track lies 24.0 m below the street and the station has been open since 8 June 1999.

Hloubětín station
Photo: Shadster, CC BY-SA 3.0, Wikimedia Commons
24.0 mbelow ground
23rddeepest of 61
1999opened

How deep is Hloubětín

The track at Hloubětín lies 24.0 m below the street. It is the 23rd deepest of 61 platforms. That is roughly an 8-storey building below the pavement.

Elevation: street 213 m a.s.l., track 189 m a.s.l. Depth is measured from the ground above the station to the track.

Escalators at Hloubětín

The longest escalator climbs about 20 m, which at a 30° slope means a run of about 39 m.

Escalators from OpenStreetMap, heights computed in the 3D model, length from the 30° slope.

Step-free access

Step-free: lift or level access all the way to the platform

Step-free entrances from the street: 3 of 7. Source: PID open data.

Entrances from the street: 7

  • E1Level entrancestep-free
  • E1Stairs · 20 steps
  • E2Stairs · 23 steps
  • E3Stairs · 23 steps
  • E4Level entrancestep-free
  • E4Stairs · 24 steps
  • E5Level entrancestep-free

Official entrance names and step counts from PID.

Ridership

17 988people board or alight each day · 52nd busiest of 58
10 389 boardings7 599 alightings

One ordinary Wednesday, 11 November 2015, 5 am to midnight (PID and DPP survey). No newer per-station data has been published.

About Hloubětín

Hloubětín is a Prague Metro station on Line B, located in the eponymous district. It was opened on 15 October 1999 as an addition to the previously opened section of Line B.

This station was once a ghost station from 1998 to 1999. The station were in a state of suspended construction as the heavy industry factories it should have served were closed after the Velvet Revolution. Trains slowed when passing through the dimly lit station. As the whole industrial area was slowly revitalized, the station was finally completed.

Text: English Wikipedia, CC BY-SA 4.0.

Technical data

BLine B

Depth
24.0 m below ground
Track
189 m a.s.l.
Street above
213 m a.s.l.
Construction
Mined, deep-level, three-vault, Prague type
Platform length
202.1 m
Opened
8 June 1999

Neighbouring stations

The whole station in 3D: escalators, passages, halls and entrances at their true depth beneath Prague.

Open in 3D